Android App Development

Dyson Sphere Program - Machine Dependency Calculator


Total number of required material A every second.

A single machine for material A produces of material A every seconds.

A single machine for material A needs of material B, which is transported on a conveyor belt of type

A single machine for material B produces of material B every seconds.

Specifications machine A (optional input):

Machine Type:
Proliferation:
Conveyor belt type that transport products from machine A:

Specifications machine B (optional input):

Machine Type:
Proliferation:



Answer:


The required number of machines for material A is -1 which produce a total of -1 material A in -1 second.
The output conveyor belt of machine A is fully saturated with 0 machines of type A. Material B input limits the number of machines of type A to 0.
The required number of machines for material B is -1 which produce a total of -1 material B in -1 second.
The chosen conveyor belt type is fully saturated with 0 machines of type B.