Dyson Sphere Program - Machine Dependency Calculator
Answer:
The required number of machines for material A is
-1
which produce a total of
-1
material A in
-1
second.
The output conveyor belt of machine A is fully saturated with
0
machines of type A.
Material B input limits the number of machines of type A to
0.
The required number of machines for material B is
-1
which produce a total of
-1
material B in
-1
second.
The chosen conveyor belt type is fully saturated with
0
machines of type B.